Apartment house Zurich-Hoengg

Mehrfamilienhaus Zuerichhoengg2

An existing building has a substantial utilisation reserve that is to be realised. Due to the renovation in 2003, a redensification with intervention in the building fabric is currently out of the question. The plan is to erect an additional building in modular timber construction. The additional building block will be located on the underground car park of the existing development and will consist of four identical units with a total of eight flats.

The new building keeps a respectful distance to the existing building due to its precise placement. The units are accessed via the newly created, high-quality inner courtyard. The densification at a central location, energy from renewable sources and the timber construction take into account the idea of sustainability.

MissionBuilding owner representation (new building, redensification)
UsageRental flats
Floor space3’000 m2
Building ownerInstitutional investor
Execution periodMarch 2021 – December 2021

David Berlart Rund

Contact

David Belart

Head of Development & ESG

Tel. +41 58 255 39 94

david.belart@avobis.ch

Brandschenkestrasse 38
8001 Zurich